A platform for research: civil engineering, architecture and urbanism
Hydraulic fill dams for Miami conservancy district
May 8 1920 n 17 p 391-394: Method of constructing earth dams with core embankments built up between side slopes enclosed by parallel levees, all made of materials excavated by dragline machines, hauled in dump cars, pumped to site and deposited by hydraulic operations. May 15 1920 n 18 p 419-422: Method of building up levees, beaches and water-tight core by means of steam shovels, window pipes and other contrivances.
Hydraulic fill dams for Miami conservancy district
May 8 1920 n 17 p 391-394: Method of constructing earth dams with core embankments built up between side slopes enclosed by parallel levees, all made of materials excavated by dragline machines, hauled in dump cars, pumped to site and deposited by hydraulic operations. May 15 1920 n 18 p 419-422: Method of building up levees, beaches and water-tight core by means of steam shovels, window pipes and other contrivances.
Hydraulic fill dams for Miami conservancy district
Public Works
Public Works ; 48
1920
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydraulic fill dams of the Miami conservancy district
Engineering Index Backfile | 1919
|The hydraulic fill dams of the Miami conservancy district
Engineering Index Backfile | 1919
|Methods of constructing hydraulic fill dams of Miami conservancy district
Engineering Index Backfile | 1919
Shrinkage of hydraulic fill in Miami conservancy dams
Engineering Index Backfile | 1935
|