A platform for research: civil engineering, architecture and urbanism
Repairs to pavement of the Belle Fourche dam
Dam is earthen structure 6200 ft. long on top and 122 ft. high above cut-off trench at maximum section. Method of repair followed consisted of refilling breaches with gravel, relaying disturbed blocks 6 to 8 in. below grade, and finishing with continuous layer of concrete to grade.
Repairs to pavement of the Belle Fourche dam
Dam is earthen structure 6200 ft. long on top and 122 ft. high above cut-off trench at maximum section. Method of repair followed consisted of refilling breaches with gravel, relaying disturbed blocks 6 to 8 in. below grade, and finishing with continuous layer of concrete to grade.
Repairs to pavement of the Belle Fourche dam
Eng. World
Hayden, B.E. (author)
Engineering World ; 17
1920
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The belle fourche dam, belle fourche project, South Dakota
Engineering Index Backfile | 1906
|Construction of the Belle Fourche dam
Engineering Index Backfile | 1910
|Engineering Index Backfile | 1912
|Method of repairing revetment on Belle Fourche Dam
Engineering Index Backfile | 1918
|The Belle Fourche irrigation works, South Dakota
Engineering Index Backfile | 1906
|