A platform for research: civil engineering, architecture and urbanism
Building the earth dams at the Bridgewater project
Three closures of large storage reservoirs built by sluicing earth fill into pool from dumped embankments.
Building the earth dams at the Bridgewater project
Three closures of large storage reservoirs built by sluicing earth fill into pool from dumped embankments.
Building the earth dams at the Bridgewater project
Eng. NewsRec
Pfaehler, Richard. (author)
1920
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Derivation of Seismic Ground Motions for Saluda, Wateree, Claytor, Walters and Bridgewater Dams
British Library Conference Proceedings | 2003
|British Library Online Contents | 2006
|British Library Online Contents | 1997
|Building large earth dams with C.C.C. labor
Engineering Index Backfile | 1933