A platform for research: civil engineering, architecture and urbanism
Excavation below arch bridge foundations
Concrete conduits 25 ft. wide constructed on opposite sides of railroad bridge pier and carried down 12 ft. below pier footings on gravel retained by steel sheet piles.
Excavation below arch bridge foundations
Concrete conduits 25 ft. wide constructed on opposite sides of railroad bridge pier and carried down 12 ft. below pier footings on gravel retained by steel sheet piles.
Excavation below arch bridge foundations
Public Works
Public Works ; 49
1920
4 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Test of sandy foundations at Arch bridge pier
Engineering Index Backfile | 1919
|Mechanics Characteristic Analysis on Subway Deep Excavation near Arch Bridge Abutment
British Library Conference Proceedings | 2011
|Mechanics Characteristic Analysis on Subway Deep Excavation near Arch Bridge Abutment
Trans Tech Publications | 2011
|Earth Pressure Analysis on Subway Deep Excavation near Arch Bridge Abutment
Tema Archive | 2011
|Earth Pressure Analysis on Subway Deep Excavation near Arch Bridge Abutment
British Library Conference Proceedings | 2012
|