A platform for research: civil engineering, architecture and urbanism
Bridge has span of 632 ft. between two reinforced concrete towers. Suspended structure is supported by four 2 1/2-in. galvanized steel cables extending over towers and anchored in concrete blocks.
Bridge has span of 632 ft. between two reinforced concrete towers. Suspended structure is supported by four 2 1/2-in. galvanized steel cables extending over towers and anchored in concrete blocks.
Columbia river suspension bridge
Eng. World
Scott, W.A. (author)
Engineering World ; 15
1919
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Suspension highway bridge in British Columbia
Engineering Index Backfile | 1931
|Erection of Columbia River Bridge erection
Engineering Index Backfile | 1894
Hudson river suspension bridge
Engineering Index Backfile | 1927
|Columbia river bridge raised 45 ft
Engineering Index Backfile | 1940
Driving Bridge River Tunnel, British Columbia
Engineering Index Backfile | 1932
|