A platform for research: civil engineering, architecture and urbanism
The reconstruction of the bridge over the narew river near Modlin (Nowo Georgiewsk) Poland
Three new large superstructures were built in place of old ones with same span of 76.86 m., according to system of parallel beam with alternating rising and falling diagonals and intermediate verticals; height of system, 7.15 m.; bay width, 7.32 m.; width of roadway, 5 m. with 1.78-m. sidewalks on either side; weight of steel construction, over 2000 tons. Details of equipment used.
The reconstruction of the bridge over the narew river near Modlin (Nowo Georgiewsk) Poland
Three new large superstructures were built in place of old ones with same span of 76.86 m., according to system of parallel beam with alternating rising and falling diagonals and intermediate verticals; height of system, 7.15 m.; bay width, 7.32 m.; width of roadway, 5 m. with 1.78-m. sidewalks on either side; weight of steel construction, over 2000 tons. Details of equipment used.
The reconstruction of the bridge over the narew river near Modlin (Nowo Georgiewsk) Poland
Die Wiederherstellung der Brucke u ber den Narew bei Modlin
Eisenbau ; 11
1920
25 pages
36 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1983
|Elsevier | 2016
|