A platform for research: civil engineering, architecture and urbanism
Description of difficulties encountered in construction of bridge, which is 1378 ft. in length, made in five spans, has a total weight of the load on superstructure of 5175 tons, and was erected at a total cost of $162 per ton.
Description of difficulties encountered in construction of bridge, which is 1378 ft. in length, made in five spans, has a total weight of the load on superstructure of 5175 tons, and was erected at a total cost of $162 per ton.
Thames river bridge
Boston Soc. Civil Engrs. Jl
Rollins, James W. (author)
1920
23 pages
17 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1890
High-level highway bridge Spans Thames River
Engineering Index Backfile | 1944
|Counterweight Trunnion Repair, Amtrak Thames River Bridge
British Library Conference Proceedings | 1995
|Military bridge over River Thames at Gravesend
Engineering Index Backfile | 1939
|High-level highway bridge Spans Thames River
Engineering Index Backfile | 1944
|