A platform for research: civil engineering, architecture and urbanism
River Hull supply scheme
City of Hull abstracts 12 mgd of water from Hull river; construction of intake works and measuring facilities described; intakes are controlled by sluice gates and are equipped with trash screens; raw water reservoirs of 350 million gal capacity; one D shaped and one circular reservoir; boulder clay stratum used as wall foundation and seal; in other places piles carry walls and cut-off prevents leakage; water treatment described.
River Hull supply scheme
City of Hull abstracts 12 mgd of water from Hull river; construction of intake works and measuring facilities described; intakes are controlled by sluice gates and are equipped with trash screens; raw water reservoirs of 350 million gal capacity; one D shaped and one circular reservoir; boulder clay stratum used as wall foundation and seal; in other places piles carry walls and cut-off prevents leakage; water treatment described.
River Hull supply scheme
Civ Eng(Lond)
Civil Engineering ; 53
1958
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
DESIGN & CONSTRUCTION OF THE HULL RIVER DEFENCES
TIBKAT | 2021
|Progress on west Hull and Haltemprice joint main drainage scheme
Engineering Index Backfile | 1957
Filling and emptying system Cordell hull navigation lock Cumberland river, Tennessee
Engineering Index Backfile | 1966
|