A platform for research: civil engineering, architecture and urbanism
Offshore tin-mining dredge double prime Bangka I'
Dredge was built by Simons-Lobnitz Ltd, and will work offshore from island of Bangka; maximum dredging depth is 131 ft 3 in.; of all-welded construction dredge pontoon, which is of rectangular section with radiused stern end and raked forward end, has length of 300 ft, beam of 80 ft and depth of 16 ft at center line and 15 ft 6 in. at side, and incorporates ladder well measuring 162 ft by 10 ft 3 in.; ladder carries 142 buckets each of 18-cu ft capacity; four Sulzer engines provide power for operation and general services; there is also diesel driven 100-kw alternator for standby duties.
Offshore tin-mining dredge double prime Bangka I'
Dredge was built by Simons-Lobnitz Ltd, and will work offshore from island of Bangka; maximum dredging depth is 131 ft 3 in.; of all-welded construction dredge pontoon, which is of rectangular section with radiused stern end and raked forward end, has length of 300 ft, beam of 80 ft and depth of 16 ft at center line and 15 ft 6 in. at side, and incorporates ladder well measuring 162 ft by 10 ft 3 in.; ladder carries 142 buckets each of 18-cu ft capacity; four Sulzer engines provide power for operation and general services; there is also diesel driven 100-kw alternator for standby duties.
Offshore tin-mining dredge double prime Bangka I'
Engineer
Engineer ; 220
1965
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
John W. Ohl [midline ellipsis] 12 double prime suction type hydraulic dredge
Engineering Index Backfile | 1948
|Dredge mining in British Columbia
Engineering Index Backfile | 1903
|FEATURES - Dredge Builder - Contractor Team - Design Mining Dredge for Coal Tailings
Online Contents | 2000
Update on Worldwide Dredge Mining
Online Contents | 1994