A platform for research: civil engineering, architecture and urbanism
Tunnel of East Bay Municipal Utility District, Oakland, Calif., 18, 004 ft. long, with fall of 12.89 ft. from east to west; driven in medium ground, with some soft ground; 12 by 12 ft. in rough, with finished concreted section 9-ft. horseshoe and invert; cost about $97.30 per ft., or 65 cents per cu. ft. of excavation; flood in tunnel was followed by flow of methane gas and explosion; technical and dimensional details are given.
Tunnel of East Bay Municipal Utility District, Oakland, Calif., 18, 004 ft. long, with fall of 12.89 ft. from east to west; driven in medium ground, with some soft ground; 12 by 12 ft. in rough, with finished concreted section 9-ft. horseshoe and invert; cost about $97.30 per ft., or 65 cents per cu. ft. of excavation; flood in tunnel was followed by flow of methane gas and explosion; technical and dimensional details are given.
California. Driving the claremont tunnel
Eng. Min. Jl
Young, G.J. (author)
1929
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
CLAREMONT UNIVERSITY CAMPUS CENTER, CALIFORNIA
British Library Online Contents | 2012
|Seismic Upgrades of the Claremont Tunnel
British Library Conference Proceedings | 2001
|CLAREMONT UNIVERSITY CAMPUS CENTER, CALIFORNIA - LEWIS.TSURUMAKI.LEWIS ARCHITECTS
Online Contents | 2012
|Seismic Design Measures for the Retrofit of the Claremont Tunnel
British Library Conference Proceedings | 2005
|