A platform for research: civil engineering, architecture and urbanism
The no 3 lister drive power station
Details of second Metropolitan-Vickers turbo-alternator set, which is tandem, high-pressure machine capable of developing 25,370 kw., when supplied with steam at pressure of 270 lb. per sq. in.; measurement of electric output; condensate and vacuum, temperatures; condenser leakage tests. See Engineering Index 1928, p. 1741.
The no 3 lister drive power station
Details of second Metropolitan-Vickers turbo-alternator set, which is tandem, high-pressure machine capable of developing 25,370 kw., when supplied with steam at pressure of 270 lb. per sq. in.; measurement of electric output; condensate and vacuum, temperatures; condenser leakage tests. See Engineering Index 1928, p. 1741.
The no 3 lister drive power station
La station centrale no. 3 de Lister Drive, a Liverpool
Genie Civil ; 94
1929
2 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Wiley | 2006
|British Library Online Contents | 2006
|ADCP-Vermessung über Sandwellen im Lister Tief
UB Braunschweig | 2003
|Fine bridge now links Lister and Farsund
Engineering Index Backfile | 1930
|The London Meeting: Koch, Lister, and Pasteur
Wiley | 1998
|