A platform for research: civil engineering, architecture and urbanism
Contrasting methods on large sewer construction in St. Louis
Excavating and concreting practice in construction of River des Peres storm-water sewer, including twin 29-ft. tube section and single 32-ft. horseshoe sections; notes on equipment used, gantry used as carryall.
Contrasting methods on large sewer construction in St. Louis
Excavating and concreting practice in construction of River des Peres storm-water sewer, including twin 29-ft. tube section and single 32-ft. horseshoe sections; notes on equipment used, gantry used as carryall.
Contrasting methods on large sewer construction in St. Louis
Contractors Engrs. Monthly
1929
7 pages
18 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sewer construction in St. Louis
Engineering Index Backfile | 1905
|Sewer construction in St. Louis
Engineering Index Backfile | 1911
Sewers and sewer construction in St. Louis
Engineering Index Backfile | 1910
|Sewer construction in St. Louis, and methods of sewer design -- Brick and pipe sewers
Engineering Index Backfile | 1911
|Construction methods on the mill creek sewer tunnel in St. Louis
Engineering Index Backfile | 1917
|