A platform for research: civil engineering, architecture and urbanism
Multiple-lane paving job organized for fast work
By close schedule of paver travel, 8.78 mi. of 70-ft. five-lane concrete pavement, curb and gutter, scheduled to require six months for construction, was completed, on Long Beach Boulevard, Los Angeles, in about two-thirds of contract time; mixer routing and progress chart.
Multiple-lane paving job organized for fast work
By close schedule of paver travel, 8.78 mi. of 70-ft. five-lane concrete pavement, curb and gutter, scheduled to require six months for construction, was completed, on Long Beach Boulevard, Los Angeles, in about two-thirds of contract time; mixer routing and progress chart.
Multiple-lane paving job organized for fast work
Eng. News-Rec
Jones, G.W. (author)
Engineering News Record ; 102
1929
3 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Paving outfit organized for 125 feet per hour
Engineering Index Backfile | 1929
EXTERNAL PAVING - Fast-track concrete block paving
Online Contents | 2000
|British Library Conference Proceedings | 1994
|A well-organized brick paving project in Ohio
Engineering Index Backfile | 1930
|