A platform for research: civil engineering, architecture and urbanism
High-speed concreting marks New York highway job
Account of operations on road between Monticello and Liberty, N. Y., by which more than 2000 ft. of 8-in. pavement 10 ft. wide were laid in one day, with season's average of over 1800 ft. with 27E paver.
High-speed concreting marks New York highway job
Account of operations on road between Monticello and Liberty, N. Y., by which more than 2000 ft. of 8-in. pavement 10 ft. wide were laid in one day, with season's average of over 1800 ft. with 27E paver.
High-speed concreting marks New York highway job
Pub. Works
Weyrauch, H.O. (author)
Public Works ; 60
1929
4 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concreting Troy-Pocahontas highway
Engineering Index Backfile | 1922
Concreting liberty highway tunnels
Engineering Index Backfile | 1922
Special forms speed concreting
Engineering Index Backfile | 1956
High speed in concreting at norris dam
Engineering Index Backfile | 1935
Speed concreting on S.F. Apartments
Engineering Index Backfile | 1949