A platform for research: civil engineering, architecture and urbanism
Establishing a state record in concrete road building
Maximum production of 397 batches in 8 hours on 10-ft. work, and average daily 8-hour production of 329 batches for entire job, is record for paving on Redwood Highway from Santa Rosa to Willowbrook, Calif.; pavement laid in two strips; planning and supervision are responsible for progress; equipment; handling of aggregates; mixing, placing and finishing.
Establishing a state record in concrete road building
Maximum production of 397 batches in 8 hours on 10-ft. work, and average daily 8-hour production of 329 batches for entire job, is record for paving on Redwood Highway from Santa Rosa to Willowbrook, Calif.; pavement laid in two strips; planning and supervision are responsible for progress; equipment; handling of aggregates; mixing, placing and finishing.
Establishing a state record in concrete road building
Roads Streets
Edwards, R.W. (author)
Roads and Streets ; 69
1929
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Road building sets record for employment
Engineering Index Backfile | 1931
|Building state-aid concrete road near Grand Rapids
Engineering Index Backfile | 1917
Old Ohio concrete road shows record service
Engineering Index Backfile | 1933
|Bentham Science Publishers | 2015
|Engineering Index Backfile | 1917
|