A platform for research: civil engineering, architecture and urbanism
Record of concrete paving under desert-heat conditions; record of 409 one-minute batches, or 409 cu. yd. of concrete in 8-hr. day.
Record of concrete paving under desert-heat conditions; record of 409 one-minute batches, or 409 cu. yd. of concrete in 8-hr. day.
Imperial Valley Highway, California
West. Construction News
Potts, A.H. (author)
1929
3 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reduced-Runoff Irrigation of Alfalfa in Imperial Valley, California
British Library Online Contents | 2001
|Reduced-Runoff Irrigation of Sudan Grass Hay, Imperial Valley, California
British Library Online Contents | 2001
|Engineering Index Backfile | 1940
Irrigation runoff insecticide pollution of rivers in the Imperial Valley, California (USA)
Online Contents | 2004
Water flow and salt transport in cracking clay soils of the Imperial Valley, California
Online Contents | 2006
|