A platform for research: civil engineering, architecture and urbanism
Semi-penetration method of road construction is used in country town of Victoria; Colas, emulsified bitumen, is binding material, and costs work out at 4/4.3 per sq. yd. where foundation was already prepared and 5/1.7 where old surface had to be ripped up and carted away.
Semi-penetration method of road construction is used in country town of Victoria; Colas, emulsified bitumen, is binding material, and costs work out at 4/4.3 per sq. yd. where foundation was already prepared and 5/1.7 where old surface had to be ripped up and carted away.
Road construction in Bendigo, Victoria
Commonwealth Engr
Slight, O. (author)
1929
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
LEADING DEVELOPMENTS - Bendigo Details Gold Project Development Strategy
Online Contents | 2004
Bendigo Biological Nutrient Removal Plant Start Up and Commissioning
British Library Conference Proceedings | 1993
|Road construction in Fitzroy, Victoria
Engineering Index Backfile | 1929
|