A platform for research: civil engineering, architecture and urbanism
Low-cost coffer dam wins contract
Contractor uses wood piling with sand bank inside to keep section of river bed dry in constructing Rail Terminal for Inland Waterways Corp. at Dubuque. (Construction News Edition)
Low-cost coffer dam wins contract
Contractor uses wood piling with sand bank inside to keep section of river bed dry in constructing Rail Terminal for Inland Waterways Corp. at Dubuque. (Construction News Edition)
Low-cost coffer dam wins contract
Am. Contractor
1929
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Coffer time: The development of the English coffer over the centuries
British Library Online Contents | 1999
Coffer dams in reinforced concrete
Engineering Index Backfile | 1905
|Coffer dams and floating caissons
Engineering Index Backfile | 1891
|Coffer dam and floating caissons
Engineering Index Backfile | 1890
|Steel sheet piling in coffer-dam
Engineering Index Backfile | 1930
|