A platform for research: civil engineering, architecture and urbanism
Description of methods of construction used, during years 1908-1916, in building of several kilometers of seawall, breakwater, and piers; details of caisson sinking and hydraulicing operation; effect of heavy storm on marine structures; map showing extent of demolition ordered by Allied Powers after Armistice of 1918.
Description of methods of construction used, during years 1908-1916, in building of several kilometers of seawall, breakwater, and piers; details of caisson sinking and hydraulicing operation; effect of heavy storm on marine structures; map showing extent of demolition ordered by Allied Powers after Armistice of 1918.
Construction of port of helgoland
Ueber den Bau des Hafens in Helgoland
Eckhardt (author)
Bautechnik ; 7
1929
17 pages
53 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
UB Braunschweig | 2003
|