A platform for research: civil engineering, architecture and urbanism
Extension of port of flushing, holland
Translation by A. Bijls of article published in Ingenieur, Sept. 8, 1928; details of port extension and structures costing 4,300,000 florins, driving of reinforced-concrete piles, construction of formwork and concrete pouring for quaywall 350 m. long, 17.5 m. high, costing 1,550,000 florins. See Engineering Index, 1928, p. 1434.
Extension of port of flushing, holland
Translation by A. Bijls of article published in Ingenieur, Sept. 8, 1928; details of port extension and structures costing 4,300,000 florins, driving of reinforced-concrete piles, construction of formwork and concrete pouring for quaywall 350 m. long, 17.5 m. high, costing 1,550,000 florins. See Engineering Index, 1928, p. 1434.
Extension of port of flushing, holland
Les travaux d'extension du port do Flessingue
Brinkhorst, W.H. (author)
Genie Civil ; 95
1928
3 pages
5 Figs.
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Improvements in the port of flushing, Holland
Engineering Index Backfile | 1928
|Bascule railway bridge over South Beveland Canal on Roosendaal-Flushing Line, near Vlake, Holland
Engineering Index Backfile | 1939
|Canaveral: New home port for Holland America Line
British Library Online Contents | 2001
New Jersey extension of Holland tunnel highway
Engineering Index Backfile | 1928
|