A platform for research: civil engineering, architecture and urbanism
Construction of main canal lining in kittitas division, Yakima reclamation project, Washington
Placing, by contract, of 55,000 cu. yd. of concrete in canal and tunnel lining, combination lining and flume sections, inverted siphons, culverts, turnouts, bridges, and miscellaneous canal structures; development and use of novel construction equipment and application of more modern methods for concreting operations; lining machines.
Construction of main canal lining in kittitas division, Yakima reclamation project, Washington
Placing, by contract, of 55,000 cu. yd. of concrete in canal and tunnel lining, combination lining and flume sections, inverted siphons, culverts, turnouts, bridges, and miscellaneous canal structures; development and use of novel construction equipment and application of more modern methods for concreting operations; lining machines.
Construction of main canal lining in kittitas division, Yakima reclamation project, Washington
Am. Concrete Inst. -- Jl
Ruettgers, A. (author) / Whitmore, A.A. (author)
1930
34 pages
22 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of main canal lining on kittitas division\ill\ Yakima reclamation project, Washington
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1928
Special machines place concrete lining on half of 26-mile Kittitas canal
Engineering Index Backfile | 1930
Concrete lining on Yakima project
Engineering Index Backfile | 1945
|Easton dam, Yakima project, Washington
Engineering Index Backfile | 1931
|