A platform for research: civil engineering, architecture and urbanism
Project undertaken by Mexican Government; construction methods and settlement plans; Rio Salado dam consisting of earth and gravel embankment 985 m. in length and concrete overflow section 234 m. in length, maximum height 34.8 m.; spillway roundhead buttresses conveying water pressure to counter-forts by radial compression; construction operations; repayment for lands; colonization.
Project undertaken by Mexican Government; construction methods and settlement plans; Rio Salado dam consisting of earth and gravel embankment 985 m. in length and concrete overflow section 234 m. in length, maximum height 34.8 m.; spillway roundhead buttresses conveying water pressure to counter-forts by radial compression; construction operations; repayment for lands; colonization.
The don martin project
Am. Soc. Civil Engrs. -- Proc
Weiss, A. (author)
1930
20 pages
11 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1931
|Engineering Index Backfile | 1940
ASCE | 2021
|Martin County Shore Protection Project: 1996 Project Performance
British Library Conference Proceedings | 2000
|