A platform for research: civil engineering, architecture and urbanism
Getting materials to the right place at the right time
Details of Pittsburgh contractor's system of expediting material delivery and distribution; material delivery reports; distribution despatches; material routings; application of this system to construction of 27-story addition to William Penn Hotel, Pittsburgh, within period of 12 months.
Getting materials to the right place at the right time
Details of Pittsburgh contractor's system of expediting material delivery and distribution; material delivery reports; distribution despatches; material routings; application of this system to construction of 27-story addition to William Penn Hotel, Pittsburgh, within period of 12 months.
Getting materials to the right place at the right time
Am. Contractor
1929
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Getting roads right first time
British Library Online Contents | 2013
GETTING IT RIGHT THE FIRST TIME
British Library Online Contents | 2014
|In the right place at the right time
British Library Online Contents | 2008
VIEWPOINT - Getting roads right first time
Online Contents | 2013
Online Contents | 2013
|