A platform for research: civil engineering, architecture and urbanism
Power station of town of Simbellawein; ultimate station will house three units; present contract embraces two machine sets, each consisting of one vertical pattern single-acting 3-cylinder 4-stroke Diesel engine with continuous output of 144 hp. erected by AEG.
Power station of town of Simbellawein; ultimate station will house three units; present contract embraces two machine sets, each consisting of one vertical pattern single-acting 3-cylinder 4-stroke Diesel engine with continuous output of 144 hp. erected by AEG.
Electricity and water supply
AEG Progress (English Edition)
Ziegler, O. (author)
1930
4 pages
8 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
WATER AND ELECTRICITY SUPPLY METHOD AND WATER AND ELECTRICITY SUPPLY DEVICE
European Patent Office | 2020
|Combined water-electricity separation water supply system
European Patent Office | 2023
|Centralizing structure for electricity supply and water supply of building engineering
European Patent Office | 2015
|Engineering Index Backfile | 1946
|