A platform for research: civil engineering, architecture and urbanism
Equipment to rescue [midline ellipsis] clears million-yard landslide
How Canadian National cleared large blockage involving main line in three days; landslide containing 1,000,000 cu yd occurred in British Columbia where line runs along north bank of Thompson River; after stabilizing of slide sufficiently to permit work train to ballast track, piles were driven along approximate original shore line by two "skid" drivers working toward each other.
Equipment to rescue [midline ellipsis] clears million-yard landslide
How Canadian National cleared large blockage involving main line in three days; landslide containing 1,000,000 cu yd occurred in British Columbia where line runs along north bank of Thompson River; after stabilizing of slide sufficiently to permit work train to ballast track, piles were driven along approximate original shore line by two "skid" drivers working toward each other.
Equipment to rescue [midline ellipsis] clears million-yard landslide
Ry Eng Maintenance
1951
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
2 million [midline ellipsis] Lining bolts
Engineering Index Backfile | 1946
|Weather [midline ellipsis] waves [midline ellipsis] and offshore oil
Engineering Index Backfile | 1957
|Sante Fe's corwith yard [midline ellipsis] shop makes fast car repairs easy
Engineering Index Backfile | 1957
Roadbuilding [midline ellipsis] 1939 accomplishments [midline ellipsis] 1940 budgets and outlook
Engineering Index Backfile | 1940
[midline ellipsis] for duration
Engineering Index Backfile | 1942