A platform for research: civil engineering, architecture and urbanism
Excavation methods, fourth Avenue Subway, Brooklyn
Illustrates and describes four methods used by different contractors, almost wholly in earth and sand, with occasional boulders but no solid rock. (1800 w.) (No. 19080)
Excavation methods, fourth Avenue Subway, Brooklyn
Illustrates and describes four methods used by different contractors, almost wholly in earth and sand, with occasional boulders but no solid rock. (1800 w.) (No. 19080)
Excavation methods, fourth Avenue Subway, Brooklyn
Eng Rec
1910
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Over-driven piles, Brooklyn fourth avenue subway construction
Engineering Index Backfile | 1911
|Construction of a portion of the fourth avenue subway, Brooklyn
Engineering Index Backfile | 1910
Engineering Index Backfile | 1921
Excavation and timbering on section 2, Lexington Avenue subway
Engineering Index Backfile | 1912
Concrete work on the fourth avenue subway
Engineering Index Backfile | 1912
|