Fire in long, timber-lined tunnel presented tough problems
72 days were required to restore to service 1570-ft single track bore on Moffat line, where blaze had cost three lives; actual job of estimating damage had to be delayed longer than 3 weeks because of continued intense heat, spalling rock and persistent monoxide gas; fire fighting and reconstruction methods described. Before joint meeting Am Soc Military Engrs and Am Soc Civ Engrs.
Fire in long, timber-lined tunnel presented tough problems
72 days were required to restore to service 1570-ft single track bore on Moffat line, where blaze had cost three lives; actual job of estimating damage had to be delayed longer than 3 weeks because of continued intense heat, spalling rock and persistent monoxide gas; fire fighting and reconstruction methods described. Before joint meeting Am Soc Military Engrs and Am Soc Civ Engrs.
Fire in long, timber-lined tunnel presented tough problems
Ry Age
Perlman, A.E. (author)
Railway Age ; 116
1944
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1942
|Influence of excess fuel from timber lined compartments
Elsevier | 2019
|Concrete-steel-lined pressure tunnel
Engineering Index Backfile | 1951
Concrete-lined tunnel in Scotland
Engineering Index Backfile | 1951