A platform for research: civil engineering, architecture and urbanism
Telephone line vital to delarge gas field
Notes on construction of 22-mi telephone line in south Louisiana, particularly 13 mi through swamps and marshlands; poles were placed with modified pile driver mounted on barge; completion of 22-mi line was accomplished in 30 days actual working time.
Telephone line vital to delarge gas field
Notes on construction of 22-mi telephone line in south Louisiana, particularly 13 mi through swamps and marshlands; poles were placed with modified pile driver mounted on barge; completion of 22-mi line was accomplished in 30 days actual working time.
Telephone line vital to delarge gas field
Gas Age
Gas Age ; 94
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1905
|Engineering Index Backfile | 1894
|The Load Line in Telephone Exchanges
ASCE | 2021
|Power line connecting equipment for telephone installations
Engineering Index Backfile | 1938
|Method and cost of constructing a telephone line
Engineering Index Backfile | 1908
|