A platform for research: civil engineering, architecture and urbanism
Considerable erosion at certain points caused by boulders and gravel drawn back into bucket from river bed and by debris from construction operations; floating caisson is being built to be used to unwater sections of bucket to permit replacement of eroded concrete.
Considerable erosion at certain points caused by boulders and gravel drawn back into bucket from river bed and by debris from construction operations; floating caisson is being built to be used to unwater sections of bucket to permit replacement of eroded concrete.
Spillway erosion at Grand Coulee dam
Eng News-Rec
Keener, K.B. (author)
Engineering News-Record ; 133
1944
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Maintenance of spillway bucket of grand coulee dam
Engineering Index Backfile | 1945
Multiple-arch bridge over spillway of grand coulee dam
Engineering Index Backfile | 1944
|Unique caissons make spillway repairs possible at Grand Coulee
Engineering Index Backfile | 1946
|Floating caisson facilitates repair of grand coulee spillway bucket
Engineering Index Backfile | 1950
|