A platform for research: civil engineering, architecture and urbanism
Patching high-type flexible pavements
Mar n 3 p 60 + 62 + 64 + 66-68: Suggested procedure outlined; preparing old surface; paint patching; patching with premixed material; patching mixtures; methods of making patching mixtures; patching with road mix; cold weather patching. Apr n 4 p 70-72: Temporary maintenance, repairs and resurfacing methods are discussed. May n 5 p 69-70: Procedure for widening pavements outlined. From subcommittee report "Salvaging Old High-Type Flexible Pavements," submitted at Highway Research Board Meeting.
Patching high-type flexible pavements
Mar n 3 p 60 + 62 + 64 + 66-68: Suggested procedure outlined; preparing old surface; paint patching; patching with premixed material; patching mixtures; methods of making patching mixtures; patching with road mix; cold weather patching. Apr n 4 p 70-72: Temporary maintenance, repairs and resurfacing methods are discussed. May n 5 p 69-70: Procedure for widening pavements outlined. From subcommittee report "Salvaging Old High-Type Flexible Pavements," submitted at Highway Research Board Meeting.
Patching high-type flexible pavements
Roads Streets
Roads and Streets ; 87
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Patching Flexible and Rigid Pavements
NTIS | 1979
|Engineering Index Backfile | 1953
|Engineering Index Backfile | 1944
Patching of concrete pavements
Engineering Index Backfile | 1943
Patching of concrete pavements
Engineering Index Backfile | 1944