A platform for research: civil engineering, architecture and urbanism
Research on construction embankments
Report on cooperative research with reference to fill construction experiments in Indiana and in Ohio; experiments were similar in number of respects including principal objectives, soil variables, control procedures, and types of compacting equipment used; results of both experiments lead to similar conclusions; as result, much of material included in one of reports is duplicated in other. (See also Pub Roads July-Aug-Sept v 24 n 1 1944 p 1-26)
Research on construction embankments
Report on cooperative research with reference to fill construction experiments in Indiana and in Ohio; experiments were similar in number of respects including principal objectives, soil variables, control procedures, and types of compacting equipment used; results of both experiments lead to similar conclusions; as result, much of material included in one of reports is duplicated in other. (See also Pub Roads July-Aug-Sept v 24 n 1 1944 p 1-26)
Research on construction embankments
Pub Works
Aaron, H. (author) / Spencer, W.T. (author) / Marshall, H.E. (author)
Public Works ; 75
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Research on construction embankments
Engineering Index Backfile | 1944
|Construction of Road Embankments
NTIS | 1982
Construction of reservoir embankments
Engineering Index Backfile | 1894
|Construction of reservoir embankments
Engineering Index Backfile | 1894
Rapid construction of embankments
Engineering Index Backfile | 1888
|