A platform for research: civil engineering, architecture and urbanism
Methods used in reconditioning reservoir in Roslyn, Wash, constructed in 1908; sides were of embankment and nine-tenths of floor on clay while one-tenth was bearing on sandstone, creating uneven resistance; asphaltic base lining was used, and new superimposed concrete shell, uniformly reinforced, and spaced with expansion joints combining copper water stop plates and plastic filler to permit maximum of elasticity and freedom for movement, also added.
Methods used in reconditioning reservoir in Roslyn, Wash, constructed in 1908; sides were of embankment and nine-tenths of floor on clay while one-tenth was bearing on sandstone, creating uneven resistance; asphaltic base lining was used, and new superimposed concrete shell, uniformly reinforced, and spaced with expansion joints combining copper water stop plates and plastic filler to permit maximum of elasticity and freedom for movement, also added.
Rehabilitation of reservoir
Pac Bldr Engr
Boyle, H. (author)
1944
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Frog Lake Reservoir Rehabilitation
ASCE | 1999
|Rehabilitation of Holmestyes Reservoir
British Library Conference Proceedings | 1998
|REHABILITATION OF CLEAR WATER RESERVOIR
Online Contents | 1996
|Products Solving Problems Reservoir Rehabilitation
Online Contents | 2010
Rehabilitation of Sefidrud Reservoir, Iran
British Library Conference Proceedings | 2003
|