A platform for research: civil engineering, architecture and urbanism
Installation of 102-in. penstocks through Green Mountain dam of Colorado-Big Thompson Project presented problems in design; irrigation release passes through 50-in. pipes by branching off penstock tubes; pipes welded and tested by X-ray to eliminate faulty joint sections.
Installation of 102-in. penstocks through Green Mountain dam of Colorado-Big Thompson Project presented problems in design; irrigation release passes through 50-in. pipes by branching off penstock tubes; pipes welded and tested by X-ray to eliminate faulty joint sections.
Penstock at Green Mountain
Western Construction News
Bier, P.J. (author)
1944
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Madison Penstock Rehabilitation
British Library Conference Proceedings | 1997
|Engineering Index Backfile | 1941
|Cleuson Dixence Penstock Tunnel
British Library Conference Proceedings | 2000
|Engineering Index Backfile | 1928
|Steel Penstock Rehabilitation Strategies
British Library Conference Proceedings | 1995
|