A platform for research: civil engineering, architecture and urbanism
Current meter measurements of flood discharge and records indicate that flood discharge capacity of leveed channel is equal to that of abandoned natural river channel and flood plain for comparable flood stages; also, records indicate that reach of channel controlling stage discharge relation is in large measure below levee system and was not changed by its construction.
Current meter measurements of flood discharge and records indicate that flood discharge capacity of leveed channel is equal to that of abandoned natural river channel and flood plain for comparable flood stages; also, records indicate that reach of channel controlling stage discharge relation is in large measure below levee system and was not changed by its construction.
Capacity of trinity river levee system
Civ Eng (NY)
Twichell, T. (author)
1944
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.