A platform for research: civil engineering, architecture and urbanism
Study of intermittent heating of churches
Study of heat requirements of intermittently heated building during heating-up period is presented; maximum rate of heat flow is shown to be 543,000 Btu per hr for intermittent heating in contrast to maximum flow of 314,000 Btu per hr for continuous operation. Before Am Soc Heating and Vent Engrs.
Study of intermittent heating of churches
Study of heat requirements of intermittently heated building during heating-up period is presented; maximum rate of heat flow is shown to be 543,000 Btu per hr for intermittent heating in contrast to maximum flow of 314,000 Btu per hr for continuous operation. Before Am Soc Heating and Vent Engrs.
Study of intermittent heating of churches
Heating, Piping Air Conditioning
Giesecke, F.E. (author)
1943
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1950
|Electrical heating of churches
Engineering Index Backfile | 1927
|Heating and ventilating; churches
Engineering Index Backfile | 1897
Engineering Index Backfile | 1932
|