A platform for research: civil engineering, architecture and urbanism
Memphis prepares for its next flood
Earth fill levees and 2 large pumping stations constructed; sand filled, steel sheet pile cells required to support concrete pump house and heavy pumping equipment.
Memphis prepares for its next flood
Earth fill levees and 2 large pumping stations constructed; sand filled, steel sheet pile cells required to support concrete pump house and heavy pumping equipment.
Memphis prepares for its next flood
Eng News-Rec
Engineering News-Record ; 133
1944
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1916
Eurostar prepares for next winter
IuD Bahn | 2010
|Centenarian prepares for the next 100 year
IuD Bahn | 2007
|Engineering Index Backfile | 1892