A platform for research: civil engineering, architecture and urbanism
Detroit industrial expressway
Design and construction problems on expressway's, 5.8-mi, $11, 000,000 Section 3, which is to be completed this year linking Willow Run Expressway System with City of Detroit.
Detroit industrial expressway
Design and construction problems on expressway's, 5.8-mi, $11, 000,000 Section 3, which is to be completed this year linking Willow Run Expressway System with City of Detroit.
Detroit industrial expressway
Roads Streets
Roads and Streets ; 87
1944
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
John C. Lodge expressway, Detroit
Engineering Index Backfile | 1944
|Fully-depressed expressway planned for downtown Detroit
Engineering Index Backfile | 1945
Fully-depressed expressway planned for downtown Detroit
Engineering Index Backfile | 1945
Detroit pushes expressway system through congested urban area
Engineering Index Backfile | 1954
|Expressway and industrial location
Engineering Index Backfile | 1958
|