A platform for research: civil engineering, architecture and urbanism
Construction features of Anderson ranch dam, world's highest earth dam
Methods used in diverting stream, stripping site, constructing impervious cutoff wall, and moving more than 4,500,000 cu yd of fill material 1 1/2 mi by belt conveyor; grouting and concreting operations. (See also - July n 7 p 34-41)
Construction features of Anderson ranch dam, world's highest earth dam
Methods used in diverting stream, stripping site, constructing impervious cutoff wall, and moving more than 4,500,000 cu yd of fill material 1 1/2 mi by belt conveyor; grouting and concreting operations. (See also - July n 7 p 34-41)
Construction features of Anderson ranch dam, world's highest earth dam
Pac Bldr Engr
1944
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Anderson ranch-progress on highest earthfill dam
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1943
Engineering Index Backfile | 1945
Engineering Index Backfile | 1944
Design and construction of Anderson Ranch dam
Engineering Index Backfile | 1948
|