A platform for research: civil engineering, architecture and urbanism
25-ton overhead crane bridge of nailed planks for 5,000-ton press
Details of crane built by testing stations of Karlsruhe Institute of Technology; as result of tests it was decided to make overhead crane track of wood; similar bridges can be envisaged up to 30 m long; bridge can be made in two working days. Very brief English abstract from Technique Moderne v 35 n 13 and 14 July 1 and 15 1943 p 109. (See also Engrs' Digest (American Edition) v 1 n 9 Aug 1944 p 530)
25-ton overhead crane bridge of nailed planks for 5,000-ton press
Details of crane built by testing stations of Karlsruhe Institute of Technology; as result of tests it was decided to make overhead crane track of wood; similar bridges can be envisaged up to 30 m long; bridge can be made in two working days. Very brief English abstract from Technique Moderne v 35 n 13 and 14 July 1 and 15 1943 p 109. (See also Engrs' Digest (American Edition) v 1 n 9 Aug 1944 p 530)
25-ton overhead crane bridge of nailed planks for 5,000-ton press
Engrs' Digest (British Edition)
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
25-ton overhead crane bridge of nailed planks for 5,000-ton press
Engineering Index Backfile | 1944
Design and construction of built-up wooden beams consisting of nailed together boards and planks
Engineering Index Backfile | 1941
|Bending tests of bridge deck planks
British Library Online Contents | 1999
|Bending tests of bridge deck planks
Online Contents | 1999
|