A platform for research: civil engineering, architecture and urbanism
Cranes, guyed derrick and traveler used to set girders for new highway bridge over Warrior River; bridge is 1330 ft long and consists of 12 spans; deck consists of four steel plate girders carrying 24-ft concrete roadway slab.
Cranes, guyed derrick and traveler used to set girders for new highway bridge over Warrior River; bridge is 1330 ft long and consists of 12 spans; deck consists of four steel plate girders carrying 24-ft concrete roadway slab.
High-Level bridge in Alabama
Roads Streets
Cumming, S.J. (author)
Roads and Streets ; 87
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Steel Bridge Testing in Alabama
British Library Online Contents | 1997
|Steel Bridge Testing in Alabama
British Library Conference Proceedings | 1997
|HPC Bridge Showcase Project in Alabama
British Library Conference Proceedings | 1997
|Performance of Bonded Bridge Deck Overlays in Alabama
British Library Online Contents | 2003
|Causes of Mechanical Damage to Alabama Bridge Decks
British Library Conference Proceedings | 1997
|