A platform for research: civil engineering, architecture and urbanism
2-span structure built to carry 24-ft road and 5-ft path over double line of railway and road; excavation, drainage, and shuttering described.
2-span structure built to carry 24-ft road and 5-ft path over double line of railway and road; excavation, drainage, and shuttering described.
Construction of bridge over railway
Concrete Constr Eng
Hunter, L.E. (author)
1944
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete in railway bridge construction
Engineering Index Backfile | 1899
|Railway bridge construction in Malaya
Engineering Index Backfile | 1930
|Railway bridge construction in malaya
Engineering Index Backfile | 1931
|