A platform for research: civil engineering, architecture and urbanism
Detailed description of methods and equipment used in constructing and paving municipal airport; project included 33,000 cu yd of vinsol resin concrete pavement, about 100,000 cu yd of shallow field stripping and leveling, 170,000 cu yd of drainage channel excavation, 16,000 lin ft of concrete pipe drainage and sundry items.
Detailed description of methods and equipment used in constructing and paving municipal airport; project included 33,000 cu yd of vinsol resin concrete pavement, about 100,000 cu yd of shallow field stripping and leveling, 170,000 cu yd of drainage channel excavation, 16,000 lin ft of concrete pipe drainage and sundry items.
Ready-mix at Niagara Falls Airport
Roads Streets
McKeever, H.J. (author)
Roads and Streets ; 87
1944
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Niagara Falls Intake Tunnel, City of Niagara Falls, New York
British Library Conference Proceedings | 1997
|Engineering Index Backfile | 1913
Imagining Niagara: The meaning and making of Niagara Falls
Online Contents | 1995
|Online Contents | 1994
|