A platform for research: civil engineering, architecture and urbanism
Dilution of stack effluents
In connection with preliminary plans for ventilation of Brooklyn-Battery vehicular tunnel, study was made to determine to what extent stack gases would be diluted at particular buildings within range of 100 to 500 ft from 40-ft-sq stack set in midst of group of buildings of same or greater height; also to obtain basic data of general application; use of scale models for tests; detailed test results. (10¢)
Dilution of stack effluents
In connection with preliminary plans for ventilation of Brooklyn-Battery vehicular tunnel, study was made to determine to what extent stack gases would be diluted at particular buildings within range of 100 to 500 ft from 40-ft-sq stack set in midst of group of buildings of same or greater height; also to obtain basic data of general application; use of scale models for tests; detailed test results. (10¢)
Dilution of stack effluents
U S Bur Mines -- Tech Paper
McElroy, G.E. (author) / Brown, C.E. (author) / Berger, L.B. (author) / Schrenk, H.H. (author)
1944
46 pages
Bibliography
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Dilution Calculations for Determining Laboratory Exhaust Stack Heights
British Library Online Contents | 1999
|Dilution Calculations for Determining Laboratory Exhaust Stack Heights
British Library Conference Proceedings | 1999
|Near-field dilution of wastewater effluents discharged from submerged ocean outfalls in Masan Bay
Springer Verlag | 1999
|A Dilution-Equilibration Sampling System for the Collection of Stack Emission Samples
British Library Conference Proceedings | 1992
|