A platform for research: civil engineering, architecture and urbanism
A 3 1/3-million cubic yard job on the Burlington
Description of Morris and Dougherty's big contract for construction of 18 miles of cut-off between Frederick and Vermont, Ill., on Chicago, Burlington and Quincy Railway. 13 shovels and one dragline excavator, in addition to a great fleet of locomotives and dump cars, employed.
A 3 1/3-million cubic yard job on the Burlington
Description of Morris and Dougherty's big contract for construction of 18 miles of cut-off between Frederick and Vermont, Ill., on Chicago, Burlington and Quincy Railway. 13 shovels and one dragline excavator, in addition to a great fleet of locomotives and dump cars, employed.
A 3 1/3-million cubic yard job on the Burlington
Excavating Engr
Excavating Engineer ; 18
1924
7 pages
22 Figs., partly on pp. 84-85
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Seabees "Borrow" million yard mountain
Engineering Index Backfile | 1945
|Leon Hurse Dam — Characterization and Construction Approval of a Five Million Cubic Yard Borrow Area
British Library Conference Proceedings | 2022
|Engineering Index Backfile | 1893
|Quarter cubic yard universal excavator
Engineering Index Backfile | 1934
Belt loader and big haulers handle million-yard cut
Engineering Index Backfile | 1965