A platform for research: civil engineering, architecture and urbanism
Viewpoints on installation of buildings with Waggital power station as an example
Discusses working out of plans, calling for tenders, specifications, study of details, transportation of material to building site, accommodation for workers, supply of power, excavation work, concrete testing, etc. (See also - no. 7 Aug. 16 1924 pp. 77-82, no. 8 Aug. 23, pp. 99-101)
Viewpoints on installation of buildings with Waggital power station as an example
Discusses working out of plans, calling for tenders, specifications, study of details, transportation of material to building site, accommodation for workers, supply of power, excavation work, concrete testing, etc. (See also - no. 7 Aug. 16 1924 pp. 77-82, no. 8 Aug. 23, pp. 99-101)
Viewpoints on installation of buildings with Waggital power station as an example
Gesichtspunkte zur Bauinstallation mit Beispielen von Bau des Kraftwerks Waggital
Zwygart, A. (author)
1924
2 pages
18 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1916
|Taylor & Francis Verlag | 2008
Online Contents | 2012
British Library Online Contents | 2014
|