A platform for research: civil engineering, architecture and urbanism
Davis bridge power project to develop 60,000 Hp
New England power-system unit to produce 390,000,000 kw-hr. annually on Deerfield River; in 70 mi. 1700 ft. of head are to be utilized; major unit is 200-ft. earth dam, highest on record.
Davis bridge power project to develop 60,000 Hp
New England power-system unit to produce 390,000,000 kw-hr. annually on Deerfield River; in 70 mi. 1700 ft. of head are to be utilized; major unit is 200-ft. earth dam, highest on record.
Davis bridge power project to develop 60,000 Hp
Eng. News-Rec
Eaton, A.C. (author)
1924
5 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
60,000 lbs. capacity coal cars
Engineering Index Backfile | 1888
60,000 -- KVA station goes underground
Engineering Index Backfile | 1960
|Engineering Index Backfile | 1953
|Carrying 60,000 tons of timber annually
Engineering Index Backfile | 1933
NTIS | 1997
|