A platform for research: civil engineering, architecture and urbanism
Construction details of $600,000 dam just completed for Stamford Water Co., across Mill River stream and valley, about 9 miles from Stamford, Conn., to impound about 2 1/4 billions gallons water in a 285-acre reservoir; is of gravity section.
Construction details of $600,000 dam just completed for Stamford Water Co., across Mill River stream and valley, about 9 miles from Stamford, Conn., to impound about 2 1/4 billions gallons water in a 285-acre reservoir; is of gravity section.
Laurel road dam
Eng. Wld
Skinner, F.W. (author)
Engineering World ; 24
1924
5 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction methods at laurel road dam Stamford, Conn.
Engineering Index Backfile | 1923
|Online Contents | 2008
British Library Online Contents | 2004
|"Recent Advances in Laurel Flame Retardants"
British Library Conference Proceedings | 2000
|