A platform for research: civil engineering, architecture and urbanism
Deals with use in connection with two jobs, one on mountainous ground and other on marsh ground, namely; (1) repairs to Magnacun Tunnel, Rhaetic Railways system, Les Grisons, and (2) construction in reinforced concrete for floor and pile-work, at Villeneuve Gasometer, for Societe du Gaz de la Plaine du Rhone, Vevey-Leysin. From paper presented at Int. Cement Congress, Lond., and reprinted from Structural Engr.
Deals with use in connection with two jobs, one on mountainous ground and other on marsh ground, namely; (1) repairs to Magnacun Tunnel, Rhaetic Railways system, Les Grisons, and (2) construction in reinforced concrete for floor and pile-work, at Villeneuve Gasometer, for Societe du Gaz de la Plaine du Rhone, Vevey-Leysin. From paper presented at Int. Cement Congress, Lond., and reprinted from Structural Engr.
Aluminous cement, pure or mixed (sand cement)
"Cement Fondu"
Paris, A. (author)
Concrete ; 25
1924
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1941
|