A platform for research: civil engineering, architecture and urbanism
Large concrete flat buildings. Erected in thirteen weeks
Columns of Emperger type; all members of uniform size; plant and forms; concreting averaged two stories daily.
Large concrete flat buildings. Erected in thirteen weeks
Columns of Emperger type; all members of uniform size; plant and forms; concreting averaged two stories daily.
Large concrete flat buildings. Erected in thirteen weeks
Eng. News-Rec
1924
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
|Settling of large buildings and structures erected on clay loess grounds
Online Contents | 1971
|Second-largest concrete building erected
Engineering Index Backfile | 1917
Investigation of joint strength in large-panel buildings erected in seismic regions
Engineering Index Backfile | 1966
|The Quickly Erected Buildings in Modern Construction
Trans Tech Publications | 2014
|