A platform for research: civil engineering, architecture and urbanism
Cantilevering a heavy bridge span in Northern Quebec
Special conditions surrounding construction of a railway bridge across Saguenay River led to a remarkable use of cantilever erection method. A 220-ft. double-track span was cantilevered for its full length from a 90-ft approach span, because of rapid current in river. Construction data.
Cantilevering a heavy bridge span in Northern Quebec
Special conditions surrounding construction of a railway bridge across Saguenay River led to a remarkable use of cantilever erection method. A 220-ft. double-track span was cantilevered for its full length from a 90-ft approach span, because of rapid current in river. Construction data.
Cantilevering a heavy bridge span in Northern Quebec
Eng. News-Rec
Chapleau, J.P. (author) / Goodrich, C.M. (author)
1924
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Stolma Bridge - Free Cantilevering 301 meters Free Span with Pre-stressed Concrete Box Girder
British Library Conference Proceedings | 1999
|Canadian, U.S. contractors built New Soo Bridge by cantilevering
Engineering Index Backfile | 1962
Engineering Index Backfile | 1916
Steel arch bridge over Mersey has 330 m long span and 2 cantilevering side spans of 76 m length each
Engineering Index Backfile | 1961
|Erection of Quebec bridge suspended span
Engineering Index Backfile | 1916
|